Disassembly and assembly of solid wood wardrobe and construction sequence
Solid wood wardrobe disassembly and assembly
When the wardrobe is in good condition and has no large-scale damage, it is very troublesome to disassemble and reinstall it, because the wardrobe is usually glued together during assembly, which will damage the original good looks and is not easy to glue together. When installing, you can first fix the base with screws, and then nail the feet to the base panel. Then install the side panels, top panels, and back panels, and finally tighten the screws with a screwdriver according to the original holes, and then install the door panels.
Solid wood furniture can generally be disassembled and assembled many times, but try to avoid disassembling it too many times; on the one hand, some places are connected with self-tapping screws, which can easily loosen if installed in the same position, and tapping next to them will affect the appearance; on the other hand, some special accessories are easy to lose.
If the dismantling is OK and there is not too much damage, then these woods can be completely restored in the hands of experienced carpenters. At most, find some wood and repair the parts for reuse.
1. Round wooden tenon: The tools needed are also very simple, an electric drill and a round wooden stick are enough, and finally glue is applied and added with a woodworking clamp.
2. Right-angle corner code connection: This connection method is mostly used by large manufacturers to assemble furniture, which is easy to disassemble and very convenient.
3. Countersunk screw connection: Use an electric drill with a countersunk drill bit to drill holes, and then screw in the holes.
4. Straight tenon connection: This can be said to be the most commonly used by carpenters nowadays. It is simple to make, fast and efficient.
5. Dovetail: You need to use a mortise template, a bushing, and a straight milling cutter. It takes three minutes to make a dovetail, but you have to spend three days studying it, or even longer. Don't envy the advertising effects in videos or magazines. The more beautiful it is, the longer it takes to prepare.
6. Biscuit tenon: Biscuit tenon machine and woodworking clamps are needed. This connection method should be introduced from abroad. When there are many tenon joints, clamping is difficult. Generally, there are not many people using this method in China. After all, our traditional Chinese woodworking is much better than it.
If you want to remove a cabinet that is built into the wall, you must first check what the cabinet is fixed with; if it is fixed with screws, you must first remove the screws and nails, so that you can remove the cabinet.
If it is fixed with air nails, then when removing it, you must first take out the partitions and doors on the door, and then take out the air nails on the back panel. When you want to pull out the air nails on this kind of cabinet, the wardrobe will also be damaged to a certain extent. If the wardrobe is hung with a wall cabinet, you can take down the furniture by just pushing it up. Use a special set of screws, install the nail hook on the cabinet body vertically, install the thread nut on the horizontal board, insert the nail hook into the thread, turn the thread nut with a screwdriver, and tighten the connection.

Regular cleaning and tidying
Solid wood wardrobes cannot be exposed to moisture, plant fibers, and insect eggs. When using sliding doors, be sure to check whether the handles are protruding or scratching the cabinet and door panels. Avoid direct sunlight; avoid high temperatures when placing. Always keep the cabinet doors clean. The most important thing is the solid and steady feeling of solid wood furniture. Please open the doors and windows regularly for ventilation and place a small bag of dry lime or other desiccant and dust in the corners of the wardrobe. Therefore, solid wood wardrobes should not be placed in very humid places, prevent insects or use dehumidifiers regularly. The dust on the track can be cleaned with a vacuum cleaner or a small brush, and wax can be applied to hidden places such as the bottom surface, because they are likely to damage the clothes, so hardwood pads can be placed under the legs.
When the air or weather in the room is too humid, the floor should be kept clean, and attention should be paid to cleaning. Use soft cloth frequently along the wood grain, and wax should be applied on the furniture surface to prevent the cabinet from cracking and deforming. The cabinet edge should not be touched by water or other liquid solvents. Do not wipe it with a dry cloth, otherwise it will damage the side cabinet or handle. Also, reduce the evaporation of indoor moisture. If there are protrusions, clothes will be damp and bacteria will grow. I hope these are helpful to you.
Wardrobe top line installation method 1
Since the construction level cannot guarantee the deviation of the ceiling level, if the ceiling is not built and the gypsum line is used directly, the wardrobe is prone to gaps. The size of the gap depends on the extreme difference in the ceiling level. In practice, the wardrobe is usually built first and then the gypsum line, but it is difficult to ensure that there are no gaps.
If you are worried about the unevenness of the wardrobe ceiling, you can solve it by adding some putty to the plaster line. But the key lies in the cooperation between the plaster line workers and the wardrobe workers. This requires the owner to coordinate the communication between the two. After all, it is the place where you will live next, so it is worth spending some time on it.
Wardrobe top line installation method 2
Nowadays, the order of decoration techniques can be changed. If you choose to make the wardrobe first and then the plaster line, remember to protect the finished product to avoid bumps and scratches on the wardrobe during the plaster line and paint work. If the wardrobe has stains, it will be difficult to clean, and most importantly, it will affect the appearance.
Wardrobe top line installation method three
This is because the wall and plaster lines have been completed. At this time, you can start at the edge of the cabinet. In order to make the wardrobe and the wall fit as closely as possible, you can cut the edge according to the shape of the plaster line.
1. The appearance design of the six-door wardrobe is very fashionable, and the storage function is also very large. The internal space structure of the wardrobe is also very reasonable. There are long and short clothes hanging areas, folding areas, bedding areas, etc. There is even a special place to hang pants, so you don’t have to worry about wrinkling your pants.
2. The partitions of the six-door wardrobe can be disassembled at will. There are small holes reserved inside the wardrobe, but it will not affect the appearance. You can use some small plastic caps to plug the holes. When assembling, you can pull out the plastic caps on these small holes and install them at will on the reserved holes. In this way, you can design a pattern that you are satisfied with. The size of the six-door wardrobe is relatively fixed. If there are special circumstances, you have to come to your door to customize it. There are also many materials in the six-door wardrobe, and you have to be careful when making it. The six-door wardrobe is generally more durable. The installation materials it uses are all metal, but one thing is that it is not as comfortable and beautiful as a wooden wardrobe.
The construction sequence is:
1. House renovation stage (casual workers enter the site first, this type of work is temporary physical work)
1. Casual workers enter the site, demolish walls, and build walls;
2. Start to order anti-theft nets, screen doors and windows. (Screen doors and windows can be left until the end of the installation)
2. The designer measures and designs the house;
3. Chisel the ground corner line, open the wire trough, locate the opening socket, and determine the water and electricity renovation;
4. Electricians enter the site to carry out hidden water and electricity renovation projects;
5. Do waterproofing work, and do a 24-hour closed water test on the bathroom (kitchen) floor;
6. Plasterers enter the site to start laying wall tiles in the bathroom and kitchen, and finally lay floor tiles;